FY-2025 4th Round Proposals Due
Proposals for the FY-2025 4th Round GAIN Nuclear Energy (NE) Vouchers are due by 5:00pm EST on Thursday, July 31, 2025.
FY-2025 4th Round Proposals Due Read More »
Proposals for the FY-2025 4th Round GAIN Nuclear Energy (NE) Vouchers are due by 5:00pm EST on Thursday, July 31, 2025.
FY-2025 4th Round Proposals Due Read More »
Proposals for the FY-2025 3rd Round GAIN Nuclear Energy (NE) Vouchers are due by 5:00pm EST on Wednesday, April 30 2025.
FY-2025 3rd Round Proposals Due Read More »
Proposals for the FY-2025 2ndt Round GAIN Nuclear Energy (NE) Vouchers are due by 5:00pm EST on Friday, January 31, 2025.
FY-2025 2nd Round Proposals Due Read More »
NuCube will partner with Idaho National Laboratory (INL) to receive assistance in computational analysis of the heat exchanger design. INL has developed a code to optimize high temperature heat exchangers for both installation and operating costs and has validated that code for conventional shell and tube heat exchangers. This analysis will allow NuCube to assess the performance of the heat exchanger and support an optimized design prior to finalization of the detailed design and fabrication to support a demonstration project.
Heat Exchanger Evaluation Read More »
Curio will partner with Pacific Northwest National Laboratory (PNNL) to conduct an analysis of the NuCycle® flowsheet that will allow the generation of quantities and classification of anticipated waste streams and recommendations on waste forms most suitable to sequestering the generated waste streams. Results of the project would be used to determine the approach to managing waste from a pilot demonstration of NuCycle® to be performed in 2027.
Analysis of NuCycle® Flowsheet for Waste Stream Characterization Read More »
Kairos will partner with Pacific Northwest National Laboratory (PNNL) to extend measurements of dissolved oxygen and corrosion products in FLiBe to the full range of relevant/significant impurities, as well as incorporating the measurement methods into their quality assurance program/practices. Refinement of analytical methods for species in salt that impact system operation will enable Kairos to continue along the aggressive timeline for near term nuclear demonstration and commercial deployment.
Development of Analytical Techniques for Trace Impurities in 2LiF-BeF2 Read More »
Deep Fission will partner with Idaho National Laboratory (INL) to enhance its thermal hydraulics infrastructure using RELAP5-3D modeling. INL has unique expertise in developing thermomechanical and thermos-hydro-mechanical models in deep geological repositories for used nuclear fuel and geothermal applications involving deep hole drilling and heat extraction.
December 19, 2024 – The Gateway for Accelerated Innovation in Nuclear (GAIN) announced today that four companies will be provided vouchers to advance nuclear fuel and technologies. The vouchers provide companies access to the extensive nuclear research capabilities and expertise available across the U.S. Department of Energy (DOE) national laboratory complex. This is the first round of GAIN vouchers awarded for FY 2025.
DOE just announced up to $80 million is available through a new funding opportunity to spur advancements in the process to produce high-assay low-enriched uranium (HALEU). The funding will support industry partners developing innovative technologies and approaches to strengthen the HALEU supply chain in the United States. DOE is looking for applications that address technology gaps, enhance current processes to produce HALEU, and advance new technologies that could reduce risk, increase production, or reduce costs. Funding will support demonstration projects at engineering or pilot scale, as well as earlier stage applied research and development projects. Applications are due by 5:00 p.m. EST on February 26, 2025.
DOE Announces $80 Million Available to Support New HALEU Technologies Read More »
November 21, 2024 – The U.S. Nuclear Regulatory Commission (NRC) issued construction permits for the Hermes 2 test reactor facility to Kairos Power LLC on November 21, 2024, sixteen months after receiving the construction permit application from Kairos (July 2023).
Regulatory Update: NRC Issues Construction Permit for the Kairos Power Hermes 2 Project Read More »